I have been so very busy. Next up is picking out plumbing, electrical and hardware stuff for the new camp. The roof will be green metal and the siding is vinyl in browns with cream colored trip. The framing will begin on the 21st. The site work continues and should be done soon.
I think it looks like a cemetery at this point. The land keeps shifting and getting moved around so it is hard to figure it all out. This is a slope that will be made to get to the front door, which is on the river side.
If I were to stand close to where the front door will be, this is the path alongside the camp heading to the parking lot. There are those boulders again.
Just this morning I finished up the sides of the cabin for Stitcher's Hideaway. They are done except for the buttons and beads.
This is the front and back of the cabin. Next up is the roof parts.
1 comment:
I'm so excited to see you building progress. I think it's a dream coming true.
Post a Comment